Nakilat Ship Repair Yard Phase 5 – Dry Dock and Shipyard

  • Marine Structures

Royal Haskoning DHV specified the Xypex coating system to protect the concrete structure and enhance durability from the harsh marine environment. The structure is approximately 20 meters below ground level and under severe hydrostatic pressure as well as exposure to severe chloride attack and high salinity. The two-coat application of Xypex Concentrate was initiated after repairing the defective concrete with the Dry-Pac system.