Hamad Medical Corporation

  • General Construction Foundation

The operation theatre room roof in Qatar’s main hospital started leaking after a massive rainfall. Initially, the leaking areas and defective concrete was treated with Concentrate and Patch’n Plug Dry-Pac system and then two coats of Xypex Concentrate were applied to the entire roof deck areas. After the application, a water tightness test was conducted successfully.